Transmission Case

Runoff Requirements
10-piece run to 1.96 Cpk. 25-piece run to 1.47 Cpk 
50-piece run to 1.47 Cpk and a second 50-piece run to 1.47 Cpk

Machines
12 A66 / System installation

Tooling
88 tools 
Special tooling: Back-boring tools, integral 
shank HSK 63 tools, polycrystalline diamond 
drills and reamers, and diamond milling

Material
Aluminum

Parts
Automotive transmission case

Fixtures
Hydraulic clamping, 1 part per fixture

Operation
Machined complete in 6 operations

Transmission case