Search

Results for "In-"

The Advanced High Speed Machining Process

The objective of the MC1010-5X demonstration is to exhibit the combination of thin wall machining and 5-axis contouring.   Impeller Part Demo Summary The objective of the MC1010-5X demonstration is to exhibit the combination of thin wall machining and 5-axis contouring....


Makino Names Guitrau Western Regional Manager

E. Bud Guitrau has joined the growing staff of Makino as Western Regional Sales Manager for the EDM Group.   MAKINO NAMES GUITRAU WESTERN REGIONAL MANAGER Heads Up Regional EDM Sales Group MASON, OH – June 2006 – E. Bud Guitrau has joined the...


Crankcase

Runoff Requirements 1.67 Cpk on critical features Tooling 21 tools Special tooling: finish bore for crankshaft alignment, finish, bearing bore and flange hub O.D., flange undercut, flange chamfer, rough thrust face, rough, semi...


Engine Cylinder Head 2

Engine cylinder head (2) Machines 1 A77 5-axis / Stand-alone installation Runoff Requirements 1.67 Cpk on all features Tooling 30 tools  Special tooling: High-speed drills (700 sfm), approximately...


Transmission Case 2

Part Cycle Time/Volumes 13.94 minutes / 32,900 parts per year Operation 2, Op 10= 31 features, Op20 = 81 features Machines 3 A55E’s in a Gantry Cell Tooling All fine bores are processed using...


Forging Ahead

The objective of the demonstration is to show 3-axis contouring with Super Geometric Intelligence machining.   FORGING AHEAD SNC Demo Summary The objective of the demonstration is to show 3-axis contouring with Super Geometric Intelligence machining. Process...


More Results

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65