Engine Block 2

Machines 1 J88 / Stand-alone installation Runoff Requirements 10 continuous pieces Cpk > 1.96 and PC% 51%. Process capability run 32 PC, 8 hours,  Cpk > 1.47 and PC% 68% Tooling 9 tools Parts Automotive...


Gear Housing

Runoff Requirements 1.66 PPK on all features except .013mm perpendicularity, which was held to print tolerance only Tooling 18 tools  Special tooling: Multi-flute fixed and adjustable reamers, form tool for snap-ring...


Splined Yoke

Splined yoke Comments .006 true position of center slot to spline.  .006 true position of end stops to spline.  ±.001 width of slot.  .001 flatness of pads.  .004 profile of pads.  .010...


Steering Housing

Machines 6 a71 gantry robot load Material Aluminum Part Cycle Time/Volumes approx. 185,000 annual volume Runoff Requirements Full System, 1000 pcs Operation Machine complete Tooling Mapal Fixtures Op10...


Cylinder heads

Cylinder heads Machines 12 - A66s with Gantry Loaders (GSA)  3 - A88Es with Fanuc Pedestal Robots Material Aluminum Parts Automotive cylinder heads Fixtures Hydraulic Operation OP20...


Complex Molds, Superior Surfaces

The objective of the demonstration is to show how a mold_x0012_s complexity and the prescription of its optics make it impossible to maintain geometry if you hand polish the finish. The EDGE2 will demonstrate finishing without polishing.   COMPLEX MOLDS, SUPERIOR SURFACES Head...


Eliminating Cycle Time and Benching

The objective of the MCD1816 demonstration is to show that two operations are eliminated by machining a die in the hard state.   ELIMINATING CYCLE TIME AND BENCHING. Air Foil Demo Summary The objective of the MCD1816 demonstration is to show that two operations...


SGI Offers Better Surface Finish

The objective of the demonstration is to show the Hyper 5’s ability to machine a turning tool insert die electrode made from silver tungsten.   SGI OFFERS BETTER SURFACE FINISH Carbide Pill Die Insert Demo Summary The objective of the demonstration is...


Control Arms

Control Arms Machines 12 A66s with ABB Robot load Operation 2 Ops. 1 Op per fixture, 2 parts per fixture,  24 total fixtures Part Cycle Time/Volumes 5.0 min per part pair Material A356...


Transmission Case 2

Part Cycle Time/Volumes 13.94 minutes / 32,900 parts per year Operation 2, Op 10= 31 features, Op20 = 81 features Machines 3 A55E’s in a Gantry Cell Tooling All fine bores are processed using...