Search

Results for "5-Axis CNC Machine"

Steering Housing

Machines 6 a71 gantry robot load Material Aluminum Part Cycle Time/Volumes approx. 185,000 annual volume Runoff Requirements Full System, 1000 pcs Operation Machine complete Tooling Mapal Fixtures Op10...


Steering Knuckle

Steering Knuckle Tooling 12 tools  Special tooling: Combination tool to drill, face chamfer and circle interpolate back side chamfer.  1:6 taper drill. Face and back side debur tool. Machines 24...


Transmission Case

Runoff Requirements 10-piece run to 1.96 Cpk. 25-piece run to 1.47 Cpk  50-piece run to 1.47 Cpk and a second 50-piece run to 1.47 Cpk Machines 12 A66 / System installation Tooling 88 tools  Special...


Valve Bodies

Runoff Requirements 1.67 Cpk Machines 3 A55 / System installation with MMC Tooling 49 tools  Special tooling: Step “G”  drills and 6 step  Mapal reamers Parts Automotive...


Cylinder heads

Cylinder heads Machines 12 - A66s with Gantry Loaders (GSA)  3 - A88Es with Fanuc Pedestal Robots Material Aluminum Parts Automotive cylinder heads Fixtures Hydraulic Operation OP20...


Complex Molds, Superior Surfaces

The objective of the demonstration is to show how a mold_x0012_s complexity and the prescription of its optics make it impossible to maintain geometry if you hand polish the finish. The EDGE2 will demonstrate finishing without polishing.   COMPLEX MOLDS, SUPERIOR SURFACES Head...


Eliminating Cycle Time and Benching

The objective of the MCD1816 demonstration is to show that two operations are eliminated by machining a die in the hard state.   ELIMINATING CYCLE TIME AND BENCHING. Air Foil Demo Summary The objective of the MCD1816 demonstration is to show that two operations...


SGI Offers Better Surface Finish

The objective of the demonstration is to show the Hyper 5’s ability to machine a turning tool insert die electrode made from silver tungsten.   SGI OFFERS BETTER SURFACE FINISH Carbide Pill Die Insert Demo Summary The objective of the demonstration is...


Automotive Airbody

Runoff Requirements 1100-piece runoff at 1.67 Ppk for selected features 1.0 on all other features Material Aluminum 380 Parts Automotive airbody Fixtures Hydraulic clamping, 8 parts per fixture Tooling Special...


Camshaft

Runoff Requirements 1.33 Cpk. 300 pieces per fixture Machines 12 J55 / Stand-alone installation Tooling 5 tools Special tooling: Op 10 - face mill, drill combination tool. Op 50 - sheel mill, end mill, centering...


More Results

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81